Visit the Matrikon web site

News, references and more on Engineeringtalk

"Distribution Board"...

Dave Wilson

Dave Wilson, Editor, writes:
 

We see from your search that you're looking for information on the term "Distribution Board", and we have a large number of manufacturers' news releases and technical articles here on Engineeringtalk which will be of interest. Let me be your guide.
 
Start with the news release Enclosures slash delivery times from ABB Automation Tech (LV Products), which we summarised at the time by saying "The Triline-R enables panelbuilders to realistically deliver a mains board to their customer within just a few weeks after ordering it from ABB". Several months prior to that, we featured the news release Electrical management system launched from NECTA: "The key features of the NECTA On-line system are the Historic Records Document Management Module and the Change Control Management Module".
 
In January 2007, we covered the news from Cee-Norm UK concerning its Hensel Mi-1000 range - take a look at Modular enclosures create distribution panels which says: "A range of low voltage switchgear assemblies, ready for installation and type tested according to DN EN60439, Part 1 (TTA), can be produced with the Hensel Mi-1000 range of components".
 
Take a look also at the news release from ABB Automation Tech (LV Products), Catalogue for electrical contractors, as well as Metal-clad cables go under the floor from Apex Wiring Solutions, and Arcs quenched quickly and safely from Moeller Electric.
 

See also:

Bespoke panel service keeps contractors happy (October 2003)
For electrical contractor MJ Electrical Services, speedy installation is essential if it is to keep its customers happy

Panelboards span wide power requirements (October 2003)
ABB reckons it can now meet any distribution system requirement from a 100A single-phase distribution board to a 3200A four-pole Form 4 system

Switchboard aims for UK applications (August 2003)
Moeller Electric's latest low voltage distribution switchboard has been designed, engineered and manufactured in the UK specifically to meet the needs of the British market

Risk-free distribution boards help secure data (April 2003)
A new range of secured power distribution boards can be expanded or contracted as a building's occupancy level rises or falls

Kit has the lot to test to the 16th Edition (January 2003)
A complete electrical installation kit, comprising portable tester, holdall and accessories, provides the five primary test functions required by the 16th Edition IEE Wiring Regulations

Budget tester tackles wiring regs (November 2002)
Robin is offering a low-cost tester suitable for electrical contractors carrying out the four primary test functions required by the 16th Edition IEE Wiring Regulations, BS7671:2001

Loop testers stay within specs for longer (October 2002)
Stable calibration is a key feature of the latest LT7, LCB2000 and LCB2500 loop testers from Megger

Top prizes still on offer (May 2002)
According to Merlin Gerin, a new Mini Cooper and several widescreen televisions are out there somewhere just waiting to be won

Win a Mini with distribution boards (April 2002)
From now until July, contractors buying Merlin Gerin Isobar 4 Evo distribution boards will have a chance of winning a new Mini Cooper, or one of six widescreen televisions

RCD tester aids compliance (April 2002)
The MkII version of the popular Megger LCB2500 loop and RCD tester makes it easier than ever to produce the data needed for certifying electrical to the IEE Wiring Regulations (BS7671:2001)

Everyone's a winner (February 2002)
Three winners have walked away with a holiday, a day at a skid pan and a flight simulator session, thanks to competitions marking the launch of Merlin Gerin's Isobar 4 Evo distribution board

Five-year guarantee offered on panel boards (December 2001)
Merlin Gerin is now offering a five-year guarantee on its Powerpact 4 panel boards, joining the market leading Isobar 4 distribution board in providing the longest guarantee period in the market

Flexible distribution boards in a compact package (November 2001)
Manufactured to a very high standard, the Concept 3000 range of distribution boards have been designed to meet the needs of specifiers, electrical contractors and distributors

Compact overcurrent and earth leakage protection (October 2001)
The new F and G LD71 RCBO from Moeller Electric, provides protection against overcurrents and earth leakage faults from within a single unit the same width and profile as a standard MCB

Space-saving power distribution board launched (July 2001)
A space-saving power distribution board that meets the specialised needs of Internet and other data centres has been launched under the Merlin Gerin brand

Thermacam helps insurer reduce claims (June 2001)
The Royal and SunAlliance insurance company has invested in a Flir Systems Thermacam to help clients in detecting faults before they develop into insurance claims

Correct fuse or circuit breaker finding made easy (June 2001)
Identifying the correct fuse or circuit breaker to pull to isolate a particular circuit no longer has to be a matter of guesswork with the launch of the Kew Technik Socket and See Fuse Finder

The technical issues surrounding TVSS devices (February 2001)
This article from Advance-Galatrek gives advice on typical causes of power surge, as well as information on the differing types of transient voltage surge suppression devices

 

Send us a blank email now to get the Editor’s free regular email newsletter.
News by product category
News headlines today
News by manufacturer
Engineeringtalk Home Page