Visit the Schunk Intec web site

Week 6 July - 12 July 2008

Showing 21 - 30 of 102 articles

Back to 'News by month'

Reseller deal aids Indian electricity upgrade

Metering infrastructures like Echelon's NES System can make the energy grid more efficient by enabling utilities to implement direct load control and demand/response programmes.

News from Echelon, 10 July 2008

Kit eases electrical safety testing

The Seaward PAT upgrade kit provides a practical solution to enables users of PAT testers to comply with the IEE code.

News from Seaward Electronic, 10 July 2008

Further information available  Further information available

Blowers separate light recyclable material

Article typeUser Application Article

ACI recommended centrifugal blower units because they deliver the best air flow and pressure for their size, ideal for blasting "lights" from falling media.

News from Air Control Industries, 10 July 2008

Further information available  Further information available

Machinery guard allows customisation on-site

Manufactured in either polyethylene or aluminium, the guards can be easily trimmed to size following pre-formed cutting guides in the body and projecting shaft sleeves.

News from Rexnord UK, 10 July 2008

Flow meters suit hazardous environments

Flo-Dar is suited to remote monitoring applications and can be supplied with GSM and GPRS-compatible modems to enable low-cost data transfer and 'always on' monitoring.

News from Flowline, 10 July 2008

Water filter/kettle competes for innovation award

Filket sers do not have to dispose of bulky plastic water filter systems and only change a thin recyclable membrane.

News from Institution of Engineering and Technology, 10 July 2008

CAE solution helps design military vehicles

Article typeUser Application Article

Force Protection Industries is using HyperWorks to develop multiple versions of the company's three vehicles: Buffalo, Cougar and Cheetah.

News from Altair Engineering, 10 July 2008

Profibus installations pass 25 million mark

The Profibus node installed base has increased by 25% in a single year, from 20 to 25 million.

News from Profibus Group, 10 July 2008

Magnet bases ease accelerometer fitting

Magnet bases suit walk-around data collection because they allow the vibration sensor to be easily moved from point to point.

News from Wilcoxon Research, 10 July 2008

Software speeds PLM setup

ICP Autodesk Inventor and AutoCAD connector for Aras Innovator allow users to load and save a 3D model structure as a document structure in Aras Innovator.

News from Aras Corp, 10 July 2008

Showing 21 - 30 of 102 articles

Back to 'News by month'

Not what you're looking for? Search the site.

Back to topBack to top

Featured articles

Contact
Pro-talk

Reach an audience of thousands

Visit the Schunk Intec web site

Browse by category

All suppliers A - Z

A Pro-talk Publication

A Pro-talk publication