Visit the Eriks UK web site

Fabrication unit is ready for use

An Arc Energy Resources product story
Edited by the Engineeringtalk editorial team Apr 23, 2007

New 900m2 fabrication unit is divided into four self-contained and fully enclosed areas to avoid the possibility of cross contamination.

Arc Energy Resources has completed a new 900m2 fabrication unit at its Gloucestershire factory.

The unit, which is divided into four self contained and fully enclosed areas to avoid the possibility of cross contamination, includes two dedicated stainless-steel workshops, a carbon-steel workshop and an area for maintenance, R and D and goods inwards.

The new fabrication unit is served by three overhead cranes ranging from 2 to 5t capacity, and a central liquid argon distribution system with on-site gas mixing capability.

Other facilities include bead blasting, pressing, CNC, plasma cutting, rolling and NDT.

Not what you're looking for? Search the site.

Back to top Back to top

Google Ads

 

Contact Arc Energy Resources

Related Stories

Contact Arc Energy Resources

 

Newsletter sign up

Request your free weekly copy of the Engineeringtalk email newsletter ...

Visit the Eriks UK web site

Articles by product category

All suppliers A - Z

A Pro-talk Publication

A Pro-talk publication