Product category:
Cabling, Conduit, Accessories and Signal Conditioning
News Release from: Datwyler (UK) | Subject: Optofil ZGGT 1000 TBM
Edited by the Engineeringtalk Editorial
Team on 10 August 2004
Fibre-optic cable links tunnelling
machinery
Optofil ZGGT 1000 TBM is a new fibre optic cable that can be combined with a specially developed, very compact self-winding system for tunnel boring machines (TBMs).
Optofil ZGGT 1000 TBM is a new fibre optic cable that can be combined with a specially developed, very compact self-winding system for tunnel boring machines (TBMs) This solution facilitates the transmission of control, alarm and signalling data between the tunnelling equipment and external construction site management
This article was originally published on Engineeringtalk on 9 Aug 2004 at 8.00am (UK)
Related stories
Fibre optics link tunnellers to outside world
Datwyler Cables and Systems is announcing a new fibre optic cable, Optofil ZGGT 1000 TBM, and a specially developed, very compact self-winding system for tunnel boring machines (TBMs).
The sweet taste of a fascia panel
Such was the early success of the Flapjack fascia that Datwyler had sold all its stock before the first consignment arrived from Switzerland.
Datwyler's new fibre-optic system has recently been employed for the construction of the new Gotthard Base Tunnel on the longest section, Amsteg (12km).
Optofil ZGGT 1000 TBM is a special cable with a central tube construction for up to 12 optical fibres.
Due to its torsion-relaxing properties and its associated good lying behaviour it is particularly suitable for continuous self-winding from the TBM.
Further reading
Cat6 connection system is catching on
Datwyler's Unilan Ultimax UTP solution is being installed in a growing number of large-scale building projects around the UK.
Guard and clip protect against disconnection
Accidental disconnection of computer network systems can have catastrophic consequences, but two simple devices from Datwyler can avoid the problem.
It provides reliable and nondisruptive transfer of large amounts of data over long distances during the whole construction period.
In the Gotthard Base Tunnel the Datwyler solution is used for controlling the fire alarm unit, conveyor belt, air conditioning, ventilation as well as the temperature, for monitoring the rock pressure and video monitoring, for surveying the tunnel drive as well as external visualisation and data backups.
Thanks to its good laying properties, Optofil ZGGT 1000 TBM can also be laid via cable pallets.
It provides nonmetallic rodent protection and is watertight longitudinally.
The materials used for the special cable are halogen-free and do not release corrosive gases in case of a fire.
As space on a TBM is at a premium, Datwyler developed a very compact winding system for the cable that allows for an uncoiling from the tunnel drive synchronously over part lengths of up to 1650m.
Datwyler's system provides rugged components and a very limited malfunction probability.
The fibre-optic connection is capable of functioning when the TBM is operating 24 hours per day and 365 days per year.
Quality controls and measuring on the spot ensure a non-disruptive and safe data transmission between TBM and external control centre.
This solution substantially eases operation for the site management.
The possibility of controlling and monitoring major sections of the construction site externally via optical fibre saves those responsible a large number of lengthy trips.
The activities at both tunnel drives can be constantly supervised by video cameras.
Visualisation at the control centre enables technicians to react quickly and efficiently should incidents occur.
The machine data can also be viewed and evaluated at any time outside the tunnel.
• Datwyler (UK): contact details and other news
• Email this article to a colleague
• Register for the free Engineeringtalk email newsletter
• Engineeringtalk Home Page
