Do's and don'ts of load-cell installation
This article offers guidance on achieving the best results from load cells in industrial applications.
The correct installation of load cells is vitally important to ensure optimum performance and weighing system longevity.
Load cells are designed to measure loads through their primary axis and any off-axis loads can cause serious problems.
Although careful consideration may have been given to the overall design of the weighing system, it should not be taken for granted that every thing on site will be 'hunky dory'.
Manufacturing tolerances, together with discrepancies in civil engineering work can cause problems.
It is therefore vitally important to carry out a thorough check of the main components, load bearing structure and load-receiving element before proceeding with the installation.
Check also that adequate drainage has been provided if load cells are fitted on the ground in order to avoid them sitting in water or process chemicals.
Load cells may have been stored on site prior to installation and these should be carefully checked to ensure that the original packaging is in good condition and that they are the correct type and capacity.
Any threads in steel plates or girders should be checked for integrity and depth.
Fixing bolts may appear to tighten correctly but in reality, reach a dead-end before actually securely fixing what they are supposed to.
This can often be the case where concrete or grout has migrated into the thread.
Most process weighing systems involve the 'craning' or otherwise 'lifting-in' of tanks or silos.
If this is the case, it is always prudent to use dummy mounting assemblies during this procedure to avoid damaging the load cells.
Well designed, modern mounting hardware assemblies usually now allow the fitting of these in the jacked up position without the load cell.
This permits adjustments to be made, final welding to be carried out and pipe work to be aligned and connected before the load cells are installed.
The levels of dummy assemblies should be adjusted to align with both the support structure and the load-receiving element.
This is usually achieved by adjusting the level of the base plates before they are finally grouted in position.
If the load cells are mounted on top of steel structures, then levelling can be carried out using steel spacers or shims.
On no account should mating surfaces be pulled together using the connecting bolts! Once the basic levelling and adjustments have been made, the live load cells can be carefully fitted and the load-receiving element lowered.
Remember that the threads of any jacking bolts are almost certainly not strong enough for this operation and suitable jacks must be used.
It is assumed that in new weighing installations that the structures involved are designed to be more than adequate for their purpose.
However, if load cells are retrofitted to existing structures then care must be taken to ensure that system integrity is maintained.
Although most loading assemblies are designed to prevent excessive vessel movement, they must never be used as part of a structure's overall strength.
Fitting load cells to existing structures typically involves cutting into the support legs or unbolting the structure from the ground or similar, in order to fit the load cells In this situation, additional cross braces or gussets may be required to provide sufficient strength.
Unbolted legs can easily splay and buckle under load if not suitably braced.
The effects of temperature on load cells and weighing systems can be a major source of error, resulting not only in poor weighing but also causing major damage.
One topic often ignored when fitting load cells relates to the possible relative expansion and contraction of the load receiving element and the support structure or ground works.
When fitted, the loading assemblies must allow for sufficient movement which occurs over the whole of the anticipated operating temperature, taking into account the maximum possible deviations which may occur between extreme winter and summer conditions.
If the system is operated in doors, then large temperature extremes may occur especially in areas such as smelting plants.
Remember also, that during installation, the ambient temperature may be well below that at which the system will operate in practice.
Huge forces can be generated by expansion forces if adequate clearances are not allowed for.
Pipework attached to weighing systems can be a major source of error and non repeatability.
Hopefully, careful design criteria will have been followed during the design stage to minimise the effects a provide a well balanced system.
However, turning theory into reality on site may not be as straightforward as expected.
Good pipework alignment with vessel flanges is vital.
Although it may be tempting to pull flanges together using the connecting bolts, this will inevitably lead to problems.
If pipe work does not align, then it is prudent to carry out remedial work before final connections are made.
It is quite common for pipes to carry hot liquid which therefore requires them to be lagged or insulated.
Lack of diligence in the fitting of this can introduce problems.
If possible, all insulation should be carried out prior to commissioning.
Once the weighing system has been installed and prior to calibration, it is important to carry out a final levelling procedure.
This 'cornering' process will ensure equal load distribution amongst the load cells - especially important in a four-load-cell system.
The electrical output from each individual load cell is measured for comparison and where practical, these readings should agree within 1mV or better.
Note that, ideally, the weighing system should be loaded to full capacity and emptied before carrying out any measurements.
If the readings are outside the acceptable tolerance, then shims can be fitted between the top of one or more loading assemblies and the - element in order to redistribute the load sharing.
It is important to ensure that the load cells and their cables are provided with suitable mechanical protection.
Remember that maintenance engineers and other work personnel may not be as diligent as you and may use load cells as suitable step ups during work on the system.
Damage to cables can be very costly and they should be routed through conduit where possible.
Remember also not to allow cables to become somewhere for water to track down towards the load cell.
In summary, do: use dummy load cells during system installation and final alignments/adjustments; store and handle load cells carefully prior to and during installation; ensure that their certificates of conformity are kept in a safe place; check load cells before fitting for correct model, capacity and thread combination; check that any threaded fittings screw smoothly into the load cell before final assembly; always use high quality bolts and fittings; use care when tightening mounting bolts and restraints such as tie bars; use the recommended fixing torque; use lock nuts as appropriate on threaded fittings especially if vibration is present; check out cable colour code for load cell prior to connection; use good quality connecting terminals and junction boxes - solder joints if possible; provide adequate and effective earthing between weigh system and ground.
Ensure that every load cell is at the same earth potential; and fit earth straps between top and bottom of mounting assembly.
And don't: carry out electric welding near load cells; forget to check specific storage and operating temperatures; ever carry load cells by their cables; force bolts or threaded assemblies; use mounting bolts to pull uneven mounting surfaces together; use excessive force when fitting or tightening mounting bolts or hardware - especially on low-capacity cells; twist 'S' cells when tightening threaded fittings; cut load cell cables unless absolutely necessary - this may affect performance and invalidate warranties; allow moisture to get into any interconnections; leave load cell cables unprotected; and don't allow the load cell to be the electrical link between ground and metal weighing structure.
Finally, remember that the overall performance of a weighing system will be dependent on the method and effectiveness of the calibration method used to relate applied load to weighing system output.
Hopefully this will have been considered during the design phase.
Once the system is up and running, remember to carry out regular routine maintenance.
This can highlight potential sources of problems before they occur.
Not what you're looking for? Search the site.
Articles by product category
- Consultancy and Services (903)
- Machine Building (4,517)
-
Engineering Design Software (6,179)
- Engineering Design Software (12)
- 2D CAD software (200)
- 3D CAD software (1,157)
- FEA and structural analysis software (369)
- Fluid, thermal, noise, vibration software (334)
- Simulation, modelling, validation software (914)
- Rendering, visualisation, styling software (196)
- Materials design and moulding design software (151)
- Process, instrumentation, automation software (258)
- Electrical design software (164)
- Publishing and documentation software (229)
- Maths, charting, statistics, QA software (317)
- Data, document management software (310)
- CAM, CNC, production management software (568)
- File conversion software, data capture (351)
- PLM and collaboration software (649)
-
Drives, Motors and Controls (3,361)
- Drives, Motors and Controls (1)
- Precision Motors and Gears (411)
- Industrial Drives/Controls (1,276)
- Linear Drives and Motors (114)
- Industrial Motors (497)
- Stepper and Servo Drives, Motors, Controls (1,060)
- Small Mechanical Components, Joining, Tools (1,975)
-
Control and Instrumentation (5,028)
- Plantwide control (1,324)
- Plant- and Machine-Wide Communications (1,174)
- Smaller-Sized PLCs (387)
- CNC and Motion Controllers (184)
- Mid-range and Large PLCs (201)
- Power Supplies, Uninterruptible Power (562)
- HMIs/Operator Interfaces (294)
- Logic Controllers, Timers and Relays (96)
- Cabling, Conduit, Signal Conditioning (806)
-
Monitoring, Measurement and Quality (5,459)
- Monitoring, Measurement and Quality (1)
- Data acquisition Software and Communications (494)
- Data Acquisition Hardware and PC I/O Boards (472)
- Electrical and Electronic Testing, PAT Equipment (630)
- Form/co-ordinate, optical, vision instruments (703)
- Gauges, Indicators and Instruments (440)
- Data loggers (422)
- Materials testing equipment (421)
- Telecomms/network test equipment, software etc (154)
- Testing and Calibration Services and Information (500)
- Testing, analysing and monitoring equipment (1,222)
-
Electrical and Electronic Equipment Design (4,160)
- Batteries, chargers and circuit protection (555)
- Connectors, Terminals, Busbars, Slip Rings (679)
- Enclosures and Equipment Cooling Fans (709)
- Knobs, Handles and Enclosure Hardware (420)
- PCs and Embedded Systems (798)
- Electrical and Electronic Subassemblies (369)
- Electrical and Electronic Components (630)
-
Materials and Processing (2,963)
- Materials and Processing (5)
- Materials and components (2,215)
- Rapid Prototyping (458)
- Materials processing and testing (285)
-
Engineering Industry News, Resources (6,093)
- Engineering Industry News, Resources (4)
- Engineering Business News, Views (388)
- Engineering Exhibitions, Events (562)
- Engineering Conferences (425)
- Engineering Seminars (400)
- Engineering Industry Developments, Awards (633)
- Engineering Guides, Newsletters (349)
- Engineering Recruitment, Employment (219)
- Engineering Training Courses (433)
- Engineering Education, Resources, Standards (838)
- Engineering Industry Reports, Surveys (597)
- Electronic Resources for Engineers (278)
- Health and Safety Legislation (402)
- Health and Safety Strategy, Risk Assessment (113)
- Health and Safety Consultancy, Software (175)
- Health and Safety Events, Training, News (277)
-
Powertrain Design (3,598)
- Powertrain Design (2)
- Bearings (939)
- Chains and belts (326)
- Gears, brakes, couplings and engines (1,441)
- Hydraulic Components (471)
- Lubricants (418)
-
Capital Equipment (3,387)
- Capital Equipment (1)
- Manufacturing Machinery and Plant Equipment (468)
- Production line blowers and fans (62)
- Compressors and Air Treatment (510)
- Electronics Manufacturing, Tools, Instruments (192)
- Electrical hardware (131)
- Machinery and Production Equipment (1,093)
- Robotics, Handling and Storage (930)
-
Sensors (7,080)
- Sensors (8)
- Accelerometers and Vibration Sensors (427)
- Loadcells, Force Sensors, Torque Sensors (699)
- Pressure sensors (621)
- Flowmeters and Flow Sensors (618)
- Level Sensors and Leak Detectors (527)
- Linear Position Sensors (399)
- Rotary Position, Tilt and Angular Sensors (546)
- Proximity Sensors (700)
- Gas, Chemical, Radiation, Magnetic Sensors (284)
- Humidity and Environmental Sensors (152)
- Temperature sensors (612)
- Vision and Colour Sensors (1,384)
- Barcode Sensors (103)
- Valves, Pumps, Process Hardware (3,623)
