Visit the Vaisala web site
Click on the advert above to visit the company web site

Product category: Design and Development Consultancy
News Release from: Foster Wheeler
Edited by the Engineeringtalk Editorial Team on 09 March 2007

Steam generator contract signed

Request your FREE weekly copy of the Engineeringtalk email newsletter. News about Design and Development Consultancy and more every issue. Click here for details.

A Foster Wheeler subsidiary has been awarded a contract for the design and supply of three circulating fluidised-bed (CFB) steam generators for a chemical facility located in Southern Korea.

A subsidiary within Foster Wheeler's Global Power Group has been awarded a contract from the Hanwha International Corporation for the design and supply of three circulating fluidised-bed (CFB) steam generators for a chemical facility located in the Yeosu area of Southern Korea Hanwha International Corporation is a wholly owned subsidiary of Hanwha Chemical Corporation, which is a leading petrochemical manufacturer and supplier in Asia

Foster Wheeler has received a full notice to proceed on this contract and the undisclosed contract value will be included in Foster Wheeler's first-quarter 2007 bookings.

The three 100MWe (gross megawatt electric) CFB steam generators are designed to fire bituminous coal.

To burn this fuel as cleanly as possible, limestone bed material will be used to capture the fuel's sulphur within the CFB boilers.

The CFB boilers will also be equipped with Foster Wheeler's advanced selective noncatalytic NOx reduction technology to minimise NOx emissions from the plant.

Construction of the CFB boilers is expected to begin in the summer of 2007, with commercial operation of the plant scheduled for the end of 2009.

"We are pleased to supply these state of the art CFB boilers to the Hanwha International Corporation and to be part of this important project", said Gary Nedelka, President and Chief Executive Officer of Foster Wheeler North America.

"This is another example of Foster Wheeler's commitment to supply environmentally friendly and cost-effective technology to support our clients in the chemical industry".

"We selected Foster Wheeler due to our confidence both in their CFB technology and their track record of successful CFB projects in Asia", said Youn T Kim, President and Chief Executive Officer of Hanwha International Corporation.

Foster Wheeler: contact details and other news
Email this article to a colleague
Register for the free Engineeringtalk email newsletter
Engineeringtalk Home Page

Search the Pro-Talk network of sites

Visit the Vaisala web site