Visit the Seaward Electronic web site
Click on the advert above to visit the company web site

Product category: Data loggers
News Release from: Kenda Electronic Systems
Edited by the Engineeringtalk Editorial Team on 20 February 2003

Data collection for CHP plant

Request your FREE weekly copy of the Engineeringtalk email newsletter. News about Data loggers and more every issue. Click here for details.

Enelpower UK has awarded a contract to Kenda Electronic Systems for the supply of a metering data-collection panel for the Hickson and Welch CHP plant operated at Castleford by Powergen.

Enelpower UK has awarded a contract to Kenda Electronic Systems for the supply of a metering data-collection panel for the Hickson and Welch CHP plant operated at Castleford by Powergen As the main contractor for the plant, Enelpower chose Kenda because of the company's many years of experience in producing metering data collection equipment for the electricity-supply industry

The contract covers the design, manufacture and factory testing of the dual-bay metering panel and ancillary equipment and software.

In addition to a Kenda operational metering summator (OMS), the panel will include five flow computers, a rack-mounted local collector station (LCS) running Kenda's MDCS software, and a meter processor with dual RS485 Modbus outputs.

The OMS unit at the heart of the system is designed to produce real-time data for the trading systems now used by generating companies as part of the NETA new electricity trading arrangements.

The meter processor will take the real-time data from the OMS, together with half-hour demand values from the LCS, and make all this information available to the plant's distributed control system using Modbus protocols.

Kenda Electronic Systems: contact details and other news
Email this article to a colleague
Register for the free Engineeringtalk email newsletter
Engineeringtalk Home Page

Search the Pro-Talk network of sites

Visit the Seaward Electronic web site