Key to icons
  • Video icon Video
  • Info icon Company news
  • Product icon Product news
  • Download icon Downloads
  • Casestudy icon Application news
  • Datasheet icon Technical Articles

Morgan Construction Company

All articles from Morgan Construction Company

Rod outlet contract signed

Morgan Construction company has been awarded a contract for a rod outlet to be added to an existing bar mill from the Tsingshan Holding Group Shanghai International Trading Company.

News from Engineeringtalk, 20 April 2007

Gear increaser speeds steel mill

A rod mill at Moldova Steel Works is running faster thanks to an improvement to the No-Twist Mill gear increaser implemented by Morgan Construction Company.

News from Engineeringtalk, 14 March 2007

Dutch mill to upgrade size and speed

Ovako Wire is to upgrade its wire rod mill in Alblasserdam, the Netherlands, with new high-speed equipment from Morgan Construction Company.

News from Engineeringtalk, 8 February 2007

Automation system upgrade boosts mill output

Morgan Construction Company has provided and installed new drives and an automation system for Qasco Dubai's wire rod mill in Dubai, United Arab Emirates.

News from Engineeringtalk, 2 February 2007

Steel mill design proves popular

2006 was a banner year for Morgan Construction Company with five separate orders for reducing sizing mills.

News from Engineeringtalk, 26 January 2007

Indian steel maker orders high-capacity bearings

Two sets of Morgoil KLX bearings will be installed in a new plate mill built by Delhi-based Jindal Steel and Power in Raigarh, India.

News from Engineeringtalk, 18 January 2007

Polish mill orders wire rolling line

Morgan Construction Company is to build and install a new wire rolling line to an existing bar and wire rod mill for CMC Zawiercie.

News from Engineeringtalk, 11 January 2007

Turkish steel maker signs for spare bearings

Iskenderun Iron and Steel Works Co (Isdemir) of Iskenderun, Turkey, has ordered multiple sets of Morgoil KLX bearings.

News from Engineeringtalk, 1 December 2006

Two mills for Jindal Steel and Power

Morgan Construction Company has been awarded a contract to build two mills for Jindal Steel and Power, headquartered in Delhi, India.

News from Engineeringtalk, 23 November 2006

Rod and bar mills ordered for India

Morgan Construction Company has been awarded a contract to build two mills for Jindal South West (JSW) Steel, both to be located in Toranagallu, India.

News from Engineeringtalk, 17 November 2006

Chinese mill awards major contract

Morgan Construction Company has been awarded the contract for a rod outlet and two compactors for a new single strand rod mill under construction in China.

News from Engineeringtalk, 23 October 2006

Hyundai orders steel mill bearings

Morgan Construction Company has received a significant Morgoil bearing order from Hyundai Steel, an operating company in Korea.

News from Engineeringtalk, 1 September 2006

Rod rolling mill more effective with XpertManager

XpertManager gives mill operators a single source of precise and reliable real-time information on operations and on the products during production.

News from Engineeringtalk, 21 July 2006

Korean mill orders multiple sets of bearings

The Morgoil Bearing Division of Morgan Construction Company has received a significant contract from Posco, Korea, for the design and manufacture of multiple sets of Morgoil bearings.

News from Engineeringtalk, 20 July 2006

Riches takes control

Paul Riches has been elected Vice President of Process Control for Morgan Construction Company.

News from Engineeringtalk, 23 May 2006

Cylinders set for Chinese steel mill duties

Angang New Iron and Steel has ordered new hydraulic automatic gauge control cylinders for its new 1580mm hot strip mill from Morgan Construction Company's Morgoil Division.

News from Engineeringtalk, 19 May 2006

Mexican mill orders upgrade

Morgan Construction Company has received a contract from Siderurgica Lazaro Cardenas - Las Truchas, in Mexico, for new shears for the existing two-strand bar mill.

News from Engineeringtalk, 29 March 2006

Austrian mill builder orders bearings

Morgan Construction Company has received a contract from Siemens-VAI for the design and manufacture of Morgoil bearings.

News from Engineeringtalk, 9 March 2006

Cascade orders rolling mill upgrade

Morgan Construction Company has received a contract from Cascade Steel Rolling Mills of McMinnville, Oregon to upgrade the company's single-strand rod outlet.

News from Engineeringtalk, 24 February 2006

Nucor orders mill upgrade

Morgan Construction Company has received a contract from Nucor Corporation to upgrade the company's single-strand rod outlet at the Norfolk, Nebraska steel mill.

News from Engineeringtalk, 9 February 2006

Featured articles

Contact

Back to topBack to top

Visit the Parker Hannifin Electromechanical Automation web site

Browse by category

All suppliers A - Z

A Pro-talk Publication

A Pro-talk publication