Visit the Machine Building Systems web site

Explosion proofing shown in 90 seconds

A Pyroban product story
Edited by the Engineeringtalk editorial team Apr 16, 2007

Footage screened for the first time at IMHX captured a truck being stripped down and rebuilt for explosion proofing, all within a 90 seconds time lapse.

Pyroban has treated visitors to IMHX 2007 with the opportunity to view a full explosion proof conversion in 90 seconds.

Pyroban helps companies manage their risk of explosion when handling flammable materials by re-engineering equipment so that it is safe for use within a potentially explosive environment, a process which can take several months.

Pyroban instructed a top London film producer to capture two months specialist engineering on a diesel truck conversion.

The footage was screened for the first time at IMHX and captured the truck being stripped down and rebuilt, all within a 90 seconds time lapse.

Malcolm Davis, Sales and Marketing Director at Pyroban, comments "It is very difficult to imagine the amount of work that goes into each and every Pyroban conversion, so what better way than to show it at IMHX".

"Every single component on a vehicle is assessed and where necessary replaced or modified with stringent testing, quality and certification management systems".

"The completed truck will then comply with EU and UK laws and subject to correct maintenance and repair will remain safe throughout its life".

Davis concludes "We provide a specialised engineering service for the fork truck industry and are delighted by the level of interest at IMHX".

Not what you're looking for? Search the site.

Back to top Back to top

Google Ads

 

Contact Pyroban

Related Stories

Contact Pyroban

 

Newsletter sign up

Request your free weekly copy of the Engineeringtalk email newsletter ...

Visit the Machine Building Systems web site

Articles by product category

All suppliers A - Z

A Pro-talk Publication

A Pro-talk publication