Visit the Fluke (UK) web site
Click on the advert above to visit the company web site

Product category: Testing and Calibration Services and Information
News Release from: Sira | Subject: Stadt Automasjon
Edited by the Engineeringtalk Editorial Team on 08 April 2002

Hazardous area certification is all at
sea

Request your FREE weekly copy of the Engineeringtalk email newsletter. News about Testing and Calibration Services and Information and more every issue. Click here for details.

Sira Test and Certification's Hazardous Area Centre was recently called on to send out a certification engineer to a vessel working in the Norwegian sector of the North Sea.

Sira Test and Certification's Hazardous Area Centre was recently called on to send out a certification engineer to an FPSO (floating production, storage and off-loading) vessel working in the Norwegian sector of the North Sea to carry out certification tests on a static frequency controller (speed controller) Stadt Automasjon in Norway appointed Sira to carry out the certification on a newly designed and manufactured static frequency controller for use with a Sira certified GE Transportation motor

Because the destination application for the product was an FPSO, the Petrojarl I, the combination of motor and speed controller required ATEX certification.

The Petrojarl I is a purpose-built turret moored production vessel built in Japan in 1986.

The FPSO, Petrojarl I, was undergoing an extensive refit in the Kvaerner shipyard in Stavanger, following which it was due to commence its tenth consecutive contract in the North Sea.

The refit alone cost over GBP 30 million and involved nearly 900 shipworkers.

Dave Hanks, who had only joined Sira's Hazardous Area Centre 10 days before the commission, was firstly flown out to Germany to carry out the certification tests on the machine before the machine was delivered to the shipyard for installation on the FPSO.

Owing to operational difficulties and electrical supply problems, Sira was unable to give the static frequency controller the required certification in Germany.

This meant that a second visit would be needed to complete certification.

Clearly, the owners of the FPSO (Petroleum Geo-Services) did not want to hold up production in the Glitne field in the North Sea for one ATEX certificate.

PGS was keen to get the ship out and into production as the vessel is capable of producing up to 40,000 barrels per day.

However, the newly installed machine required certification before the FPSO could be put into production.

To facilitate certification, Hanks was flown to Stavanger and then transported via helicopter to the Petrojarl I.

Hanks was able to certify the machinery after successfully completing the required tests which, in normal circumstances, would have required the dismantling of the motor two or three times.

Hanks was able to reduce this after careful examination of the test results, thus significantly reducing down time and adding to the profitability of the production contract.

Sira's Hazardous Area Centre offers product certification for equipment for use in potentially explosive atmospheres, including process plant, oil and petrochemical applications.

Sira: contact details and other news
Email this article to a colleague
Register for the free Engineeringtalk email newsletter
Engineeringtalk Home Page

Search the Pro-Talk network of sites

Visit the Fluke (UK) web site